Stamping FAQ
Answers to the questions buyers ask us most often about custom metal stamping: what to send for a quote, which materials and thicknesses we run, how tooling and samples work, what inspection you receive, and how parts ship to Malaysia, Vietnam and Thailand. If your question is not here, send the drawing and ask — the answer will be specific to your part rather than general.

Quotation and ordering
What information is needed for a quotation?
Send the drawing revision, or clear sample photos if no drawing exists, together with the material and thickness, surface finish, required quantity or annual demand, critical tolerances and target delivery date. If the part assembles with other components, include the mating part or the interface dimensions — most fit problems are decided by features that are not on the bracket drawing itself.
What file formats should I send?
PDF, DWG, DXF and STEP files are preferred. A dimensioned PDF is enough to quote. A DXF or STEP file lets us check the flat pattern and bend deductions before tooling, which is worth sending if you want the blank reviewed as well as the finished part. Physical samples or clear photographs can also be reviewed when no drawing exists.
What is your MOQ?
MOQ is evaluated for each part from the drawing, the tooling requirements and the expected quantity. A simple bracket on a single-stage die can start at a low batch; a progressive die only makes sense at repeat volume. Ask for the quantity breaks in the quotation, because the step between batch sizes is usually larger than buyers expect.
Do you quote from a sample if there is no drawing?
Yes. Send the sample, or photographs with the key dimensions and the material if it is known. The quotation will list the dimensions we have assumed, so the drawing we work to can be confirmed before tooling starts. A sample alone rarely fixes tolerances, finish or acceptance criteria, so those are agreed separately.
How long does a quotation take?
Drawings are reviewed in the order they arrive. A part that needs no clarification is normally priced within one working day. Parts that need process or tooling review take longer, and we will tell you what is outstanding rather than send an indicative price that has to be revised.
Materials and design
What materials do you stamp?
Q235 carbon steel, SPCC cold-rolled steel, 304 stainless steel, copper and aluminium are our regular materials; brass is available on request. State the grade on the drawing, because it changes formability and die clearance. 304 stainless work-hardens, so a cup that draws in two stages in SPCC may need three or four stages in stainless.
What thickness range can you handle?
From 0.5 mm to 10 mm, confirmed per drawing. Thickness is not only a press question: it sets the die clearance, the minimum bend radius, and whether a feature can be pierced without distortion. A 0.5 mm part and a 6 mm part with the same outline are different tooling projects, even though the drawing looks similar.
What tolerance can you hold?
Tolerance is agreed per feature rather than quoted as one figure for the whole part. A general ±1° bend angle on a 3 mm Q235 part is routine; holding ±0.1 mm across two bends needs a different die from holding ±0.3 mm. Mark the features that matter — a sliding fit, a bearing seat, a hole used for alignment — and leave the rest general, because every tightened tolerance is paid for in tooling and inspection.
Can you suggest changes to make the part cheaper?
Yes, and it is far cheaper to do it before tooling. The usual changes are relaxing a tolerance that no interface actually needs, moving a hole away from a bend line, replacing a sharp internal corner with a radius the punch can survive, or accepting a standard material grade instead of a special one. We raise these at quotation, not after the first sample.
Can you work from a 3D model only?
A STEP file can be reviewed, but production runs against a controlled drawing. The model does not carry tolerances, finish, burr direction or acceptance criteria, and those are exactly the items that cause a batch to be rejected. Send both if you have them; if you only have a model, we will list the assumptions that need confirming.
Tooling and samples
Do you handle the tooling, or do I own it?
We build the tooling in our own workshop and discuss ownership and maintenance terms as part of the quotation. If you may need the die transferred to another supplier later, say so at enquiry — it is much easier to agree up front than to negotiate after the first production order.
How fast can samples be made?
Small-batch custom samples can be delivered within 7 days after drawings and requirements are confirmed. That assumes the material is available and the drawing does not change during the run. A revision restarts the clock, so it is worth settling the drawing before the sample is released.
Can I get a small batch without committing to production tooling?
Yes. Low-volume parts can be produced from a simple single-stage die, or by press-brake bending where the geometry allows. The piece price is higher than a progressive-die part, but it lets you validate the design and the assembly before the tooling investment is committed.
What is the production lead time?
Production runs in 15–25 days after sample approval. Plating and coating sit outside that window and have their own lead time, so if the finish is on your build critical path, mention the date at enquiry and we will price the schedule, not only the part.
Quality and inspection
Are you ISO 9001 certified?
We operate an ISO 9001 quality management system, in place since the company was established in 2011. We are not IATF 16949 certified. For automotive safety-critical parts we will say plainly whether the part is a fit for our system rather than accept an order we cannot support with the right documentation.
What inspection documents come with a shipment?
Each lot ships with the inspection records agreed for that part: normally dimensional results for the features marked on the drawing, material certification where it is required, and a packing list that ties the lot to the drawing revision. The scope is fixed at quotation, so there is no disagreement at dispatch about what was promised.
Can you supply a first-article report?
Yes. A first-article inspection report is produced for a new or revised part and covers the dimensions and features listed on the drawing. It is issued against the sample or against the first production piece, depending on what your approval process requires — tell us which at the start.
What happens if a dimension is out of tolerance?
We inspect before dispatch, and a lot that fails the agreed inspection is held rather than shipped with a note attached. If a dimension sits repeatedly at the edge of its tolerance, the cause is usually in the die or the process rather than in inspection, and the report will say which one we believe it is.
Delivery and export
Where do you export?
Our target export markets are Malaysia, Vietnam and Thailand, and we have export experience with customers outside that group. Shipping terms, documents and packing requirements are confirmed with the quotation rather than assumed.
How are parts packed?
Parts are packed to protect edges and coating. Coated parts are separated so they do not rub in transit, and heavy brackets are packed so the carton does not collapse under its own weight. If your line needs a specific container, count per bag, or label format, state it before the order is released — repacking after dispatch is not something either side wants.
Can you ship to more than one destination?
Yes, when the split and the documentation are agreed in advance. Multi-destination shipments need the quantities and consignee details on the order, because the packing list and labelling change per destination. It is also worth confirming whether each destination needs its own inspection copy.
Still deciding?
If the question is whether your part can be stamped at all, the fastest answer comes from the drawing: geometry, material, thickness and the features you need to hold. Send it and we will reply with feasibility, the process we would use, and the points that need deciding before a price is meaningful.
Request a quote · What to include in an RFQ · Manufacturing capabilities
KEEP READING
